Home / Services / Perforation / Through-Tubing Perforation / Swing Jet II
Swing Jet II
The Swing Jet II system is the latest in thru-tubing perforating technology designed to deliver the performance of a large diameter casing gun, without having to pull the tubing from the well.
The pivot-mounted charges are designed to allow running in 2-3/8" or larger tubing and later deployed in the casing. After deploying the high performance 22 gram (1-11/16" x 4-1/2") or 32 gram (2-1/8" x 5-1/8") HMX charge, the system is fired.
The performance of the Swing Jet II gun is more than twice the penetration of other high performance through-tubing systems, and four times the penetration of standard through-tubing hollow steel carriers.
Oildata has been shooting the Golden Swing Jet since 1994, and has shot more Swing Jets in Nigeria than all the other service companies put together. The Swing Jet can be adapted for either an Electric-Line Unit or a Coil Tubing Unit.
Swing Jet Performance Data
| 1-11/16" x 3-7/8" | 1-11/16" x 4-1/2" | 2-1/8" x 5-1/8" | |
|---|---|---|---|
| Penetration | 22.8" | 26.2" | 40.0" |
| Hole Size | 0.42" | 0.39" | 0.50" |
| Shot Density | 4.4spf | 4.0spf | 3.5spf |
| Minimum Restriction | 1-25/32" | 1-25/32" | 2-3/16" |
If you are interested in this service, please fill out our Service Request Form, and we will get back to you promptly.
News & Articles
-
Nigeria: How the proposed petroleum industry bill PIB will boost local participation
by Engr. Debo Fagbami (Mar 02, 2010)
-
Nigeria: How the proposed petroleum industry bill PIB will boost local participation
by Engr. Debo Fagbami (Mar 02, 2010)
Case Histories
Oildata was the first company to successfully record a horizontal well Production Log on an ExxonMobil Well in West Africa
– Ubit 71, Ubit 75, 1995
The first service company to log a memory log on a short Radius horizontal well in Africa.
– Ashland, 1997
Oildata was the first company to design and install an open-close-open straddle packer system to isolate a high pressure gas zone while simultaneously permitting the production of oil from a deeper horizon.
– ChevronTexaco, 1998, 1999
Oildata was the first company to deploy a wireline tractor in a horizontal well in Nigeria to acquire reservoir data without coiled tubing or pipe conveyed logging equipment.
– Shell, 1999
Oildata successfully re-established oil production from the abandoned Salt pond Marginal field, offshore Ghana.
– SOPC/GNPC, 2002
Oildata has performed 100% of ChevronTexaco's non-rig well interventions and data acquisition requirements in Nigeria since 1996
– ChevronTexaco, 1996
